TV mounting. Into the block, not the drywall.
Most outside walls around here are concrete block behind furring strips and drywall. The mount goes through to the block, with the right anchors. Inside walls go into the studs.
The most common way a TV comes off a wall in Central Florida is a mount screwed into drywall on an outside wall, with nothing behind it but a strip of furring and an air gap. It holds for a month. We find what’s behind the wall first, every time, and say which it is before a hole is drilled.
On an inside wall the mount goes into two studs, found and checked. On an outside wall it goes through the furring into the block, with masonry anchors sized for the mount and the set. On a brick fireplace we drill the mortar joints where we can, not the face of the brick.
Ours on this job
- Flat, tilting and full-motion mounts, set level and at the height you choose
- Outside walls: through the furring into the block, with masonry anchors
- Inside walls: into the studs, never drywall anchors for a set
- Soundbars and small shelves under the set
- Cords run in a paintable cover on the wall surface
- Taking an old mount down and patching the holes
Referred, at $0.00
- A new outlet behind the TV — electrician. Adding an outlet connects to the house wiring. In Florida that’s licensed electrical work.
- Wires hidden inside the wall with a power kit — electrician. In-wall power kits connect to the house wiring, so they’re an electrician’s. A surface cover is ours.

How long these usually take
Typical times on site, for a sense of the list, not a promise. The written price comes from the owner after he’s read your list.
- TV on an inside wall, outlet already there
- 45 min – 1 h
- TV on an outside (block) wall
- 1 h – 1 h 30
- Full-motion mount, either wall
- add 20–30 min
- Soundbar under the set
- 20–30 min
Questions about this one
Can you hide the wires in the wall?
Not the power: an in-wall power kit connects to the house wiring, which is a licensed electrician’s job in Florida. We’ll mount the set and run the cords in a cover on the wall surface, or leave the wall ready for the electrician.
Do you bring the mount?
We can, or we’ll use yours. Either way it goes on the written price before anything is bought.
Got more than this on the list?
Most visits are three to seven jobs. Type them in one at a time and the chat sorts each one.